Six Sigma Green Belt - Feb

1 / 74

The following are all members of a project selection group EXCEPT:

2 / 74

  1. DPU =?

3 / 74

The purpose of using control charts is to

4 / 74

The person responsible for leading a project and solve problems is:

5 / 74

What two metrics in manufacturing are used to calculate cost of process flows?

6 / 74

Project scope can be limited by the following factors EXCEPT:

7 / 74

  1. Process is performing at sigma level of six if the difference between mean and specification limits

8 / 74

Green Belt projects are more suitable for processes that span ___________ functional areas, while Black Belt projects are more suitable for processes that span _______________ functional areas.

9 / 74

Which of the following control charts is most appropriate for monitoring the number of defects on different sample sizes?

10 / 74

Penmanship Inc. produces high quality pencils for a select group of customers. Within each production cycle of 10,000 pencils, there are two types of defects that can occur at the following rates: wrong dimensions (80 defects) and faulty eraser (45 defects). What is the Defects per Unit (DPU) measurement of this process?

11 / 74

Y = f (X)  - In this equation Y is

12 / 74

A Six Sigma project objective must be SMART. The acronym SMART stands for:

13 / 74

When the Value of  σ  reduces, the Bell Shape of the curve

14 / 74

A bell shaped curve can have same mean and different standard deviations

15 / 74

Six Sigma is a

16 / 74

Outputs of Define Phase is

17 / 74

A Black Belt practitioner is asked to facilitate a series of workshops in an organization. She notices that a few participants in the workshop are dominating the discussion. To provide leadership in this group setting, the practitioner must:

18 / 74

The primary factor in the successful implementation of six sigma is to have

19 / 74

In “Define’ phase, which tool highlights the time of project completion.

20 / 74

Jason’s team is launching a new support service network for their cellular phone customers. As the leader, Jason coordinates all functions of the launch and has sufficient managerial autonomy to make independent decisions. Jason is considered the:

21 / 74

In Define Phase, we will identify which one of the given

22 / 74

Wilma is a Black Belt practitioner tasked with providing a document that prioritizes process which provides justification for a project. What definition and prioritization tool can be used?

23 / 74

The term Six Sigma was coined by

24 / 74

_____________of the values line within ± 2σ from the mean,

25 / 74

As seen in Six Sigma methodology, the role of a leader has been transformed and updated in quality management to be that of a(an)

26 / 74

Specification Width Should be ____________ Process Width

27 / 74

The Key Performance Indicator “Productivity” most closely matches which one of the following:

28 / 74

Six Sigma can be?

29 / 74

All are sources of  VOC, Except:

30 / 74

Which two elements of the project charter are more closely related:

31 / 74

Total Area under the Normal Distribution Curve is

32 / 74

Data being used in the initial set-up of a process are assumed to have a normal distribution. If the nominal (target) is set at the center of the distribution, and the specification limits are set at ±3s from the center, then the Cpk is equal to

33 / 74

The variation seen by the customer could come from:

34 / 74

A Manager plans to test the performance of workers before and after training. Which of the following hypothesis tests should be used to determine whether the training actually improved the workers’ performance?

35 / 74

Process Width can be _____________ Specification Width

36 / 74

The central idea behind Six Sigma is that if you can measure how many “defects” you have in a process , you can systematically figure out how to eliminate them :

37 / 74

Process input and output variables can be displayed using:

38 / 74

  1. Z = (Mean – LSL) / standard deviation: this formula is used to calculate Sigma level of which data type

39 / 74

In 5 M’s : this is not a M

40 / 74

In SMART goal statement , ‘A’ refers to

41 / 74

A _______ is one who would authorize the launch of the project and provide resources to work on the project.

42 / 74

To find Sigma Level for Attribute Data, the value of   ZST can be

43 / 74

Which of the following activities are  value-added?

44 / 74

Customers, as defined in a Six Sigma project can be:

45 / 74

Out of the given statements, Which one is not True

46 / 74

Which of the following is most important in evaluating and understanding design intent?

47 / 74

All of the following are phases in the Six sigma DMAIC model except which?

48 / 74

Which project management tool can be used to identify the critical path?

49 / 74

The variation that occurs due to the factors which cannot be removed are called:

50 / 74

Within each production cycle of 20,000 chairs, there are two types of defects that can occur at the following rates: wrong dimensions (240 defects) and loose bolts (100 defects). If the defects can occur only once in each item, what is the Defects per Million Opportunities (DPMO) measurement of this process?

51 / 74

______________ is reactive while-----------  is proactive

52 / 74

The person responsible for the overall success of the Six Sigma program within a company is:

53 / 74

The Main output of the Measure phase is

54 / 74

Which of the following tools would be most appropriate for collecting data to study the symptoms of a problem?

55 / 74

Which of the following tools should be used when a team is generating and prioritizing a list of options that include highly controversial issues?

56 / 74

Weldman Industries conducts a survey which shows that their average production cycle time is 128 minutes with a sampling error of 3 seconds. What does a sampling error result from?

57 / 74

A business system is

58 / 74

In SIPOC diagram, C stands for

59 / 74

If DEFECTS are reducing, then VARIATIONS are:

60 / 74

One of the Key element in a  Project charter is

61 / 74

The ratio of tolerance width to inherent variability width in the process is known as:

62 / 74

Variation  of  Specific circumstance and do not occur in the normal scheme of actions are called as:

63 / 74

Business professional are interested in collecting data that can be used to predict future sales or customers’ behavior. Parameters are characteristics of a _______ while statistics are characteristics of a ________.

64 / 74

Flow chart is useful as it shows:

65 / 74

When Data is put in order of Size (n): 1 2 2 2 3 9 10 30: Median =?

66 / 74

Standard deviation is the measure of :

67 / 74

If the Sigma level for a process is calculated as 4, the corresponding value of CP is _______________

68 / 74

Which is the best software to conduct statistical data analysis:

69 / 74

James is a Black Belt practitioner in a medium-sized organization. He engages in continuous assessment of projects and their potential impact on the organization’s financial well-being. The cost of defects on an organization’s finances is also referred to as:

70 / 74

The Six Sigma approach we would use to improve an existing process is called _________ and the approach we would use for designing new processes is called ______________

71 / 74

Which of the following is defined as continuous, incremental improvement?

72 / 74

In quality control, the famous business adage, if it can’t be ____________, then it can’t be managed

73 / 74

  1. Filling Loan Application (Yield = 100% ) ---  Completeness  Of  Application (Yield = 92.5%) ---- Entering Applicationdata (Yield =  0%) ----- Customer Creditcheck (Yield = 94.4%).Find FTY =?

74 / 74

Six months after the work of a contractor ends, a consumer’s roof collapses. This is an example of a(an):

Your score is